Illustrative three-tank worksheet on a bridge desk overlooking a chemical tanker deck

A chemical tanker has 1,250 m³ of usable capacity across three tanks. The buyer wants to carry parcels of 600 m³ and 450 m³ on the same voyage. The aggregate capacity leaves 200 m³ to spare, yet the larger parcel has access to only one 500 m³ tank under the assumed eligibility conditions. A tank assignment exposes a 100 m³ shortfall that the aggregate figure hides.

Use this worksheet when you have a named vessel and a defined parcel programme. The result is a provisional allocation, a quantified shortfall, or a list of evidence needed before you can decide whether to keep the vessel on the shortlist.

1. Put parcel requirements and tank capacities on a common basis

Record each parcel’s product identity, quantity, volume basis and any commercial requirement to keep the parcel in one tank. If the quantity is given in tonnes, divide mass by a density in tonnes per cubic metre at the applicable volume reference condition. For example, 540 tonnes at an assumed density of 0.90 t/m³ occupies 600 m³ on that basis. Ask the technical team to confirm the volume to use for the proposed service conditions.

For each tank, request the usable volume for the intended cargo and conditions, together with the source and revision. Keep the published tank capacity as a separate reference. The worksheet uses the usable figure supplied for the scenario, including the applicable filling and cargo-specific constraints identified by the technical team.

The IMO’s overview of the IBC Code describes product-dependent ship design and equipment requirements. Establish each tank’s eligibility from the vessel’s current approved documentation and technical review. The chemical cargoes list guide explains how to identify the applicable product and read the vessel-specific approval.

2. Assign the constrained parcel first, then check the whole programme

Build one row per tank. Record its usable volume for each eligible parcel and mark any parcel–tank pair with missing evidence as pending. A capacity figure should carry the same evidence status as the eligibility decision behind it.

  1. Identify the tightest parcel. Start with the parcel that has the fewest eligible tanks or the narrowest capacity margin. Apply any verified restriction on splitting it.
  2. Reserve the assigned tanks. In this worksheet each tank is reserved for one parcel during the simultaneous carriage scenario. Unused space in a reserved tank belongs to that allocation and is unavailable to another parcel.
  3. Check every other parcel against the remaining tanks. Where assignments compete, try other permitted combinations before rejecting the candidate. Starting with the tightest parcel is a practical search order. The decision rests on whether a complete assignment exists.
  4. Record the result. Distinguish a shortfall within confirmed inputs from an unresolved allocation that depends on a pending tank or condition.

Use the cargo systems inspection guide for evidence on shared piping and isolation. Where the technical team identifies a restriction on using two assignments together, record that restriction against the combination in the worksheet.

3. Worked example with two parcels and three tanks

Illustrative data. Parcel A requires 600 m³ and parcel B requires 450 m³. The case permits splitting a parcel across eligible tanks. All capacities and eligibility conditions below are hypothetical and the numbers are on the same volume basis.

Tank Usable volume Eligible parcel Evidence still needed
T1 400 m³ Parcel B Whether parcel A is eligible
T2 350 m³ Parcel B None for this scenario
T3 500 m³ Parcel A None for this scenario

With confirmed inputs, T3 provides only 500 m³ for A. B can fit across T1 and T2. For instance, 400 m³ in T1 and 50 m³ in T2 would leave 300 m³ unfilled in T2, which remains reserved for B. A still has a 100 m³ shortfall.

Now test the pending input. Suppose T1 is confirmed eligible for A at the same 400 m³ capacity. A can then take 500 m³ in T3 and 100 m³ in T1. That assignment reserves both tanks. B is left with T2 at 350 m³ and falls short by 100 m³. A needs both T1 and T3 under this revised scenario, so trying a different split between them yields the same constraint for B.

Scenario Parcel A Parcel B Decision
Base case 500 m³ in T3. Short 100 m³. 450 m³ across T1 and T2. Fails volume screen.
T1 also eligible for A 600 m³ across T1 and T3. 350 m³ in T2. Short 100 m³. Still fails volume screen.

4. Record what would change the purchase decision

Keep the proposed assignment, the unused volume in each reserved tank and the shortfall for each parcel on one sheet. Attach the document reference for each assumed eligibility and usable volume. If a pending input cannot resolve the combined shortfall, direct the next enquiry towards a different vessel or a revised parcel programme.

When an assignment fits on paper, send the exact tank and parcel combination for vessel-specific technical and operational assessment. Ask the responsible team to check the applicable carriage conditions, tank limits, loading condition, and intended port sequence together. The worksheet’s pass means that the recorded allocation constraints have been met for shortlisting. Operational approval rests with the responsible parties using the vessel’s applicable documentation and procedures.

Share your parcel volumes, splitting restrictions and the vessel’s tank data with our sale and purchase team to focus the candidate search on the capacity and eligibility gaps that matter.

Golden Shipyard — sale & purchase

Buying, or want a second opinion?

Our sale & purchase desk can help you find, value and inspect the right tonnage. Tell us what you’re looking for and we’ll revert within one working day.